EXCELLENT DRAINAGESTRUCTURE
Old
New
INTERNAL PIPELINE DRAINAGE SYSTEM
New drainage system design, exclusive patent, better drainage, better waterproof performance
REMOVABLE AND REUSABLE
ROOF STRUCTURE
The tight bite of the tiles at the top will increase the load-bearing andwaterproofness.
1st Floor Plan
2nd Floor Plan
HOUSE DESIGN
Old
New
ONE-STOP SERVICE
OUR ADVANTAGE
PROJECT
PLAN
DRAWING
DESIGN
PURCHASE&
PRODUCTION
TRANSPO-
RTING
INSTALLATION
GUIDE
PROJECT MAN
AGEMENT
MATERIAL CONTRAST
Ours:
Contact Us
We also offer a free consultation service: our team is here to
help you find the ideal solution.
Ready to transform your vision into reality?
Contact ZN
House today and let us help bring your project to life!
Prefab structures fall into the category of long-lasting buildings, with a safe usage lifespan of approximately 20 years. However, factors such as excessive wind, snow, rain, humidity, and usage conditions can impact their longevity. Like other types of buildings, regular maintenance is necessary to ensure optimal performance.
Pricing depends on various factors, including the quality and thickness of the steel structure, the thickness and quality of materials used in the wall panels, roof insulation, and window quality. Additionally, the use of extra materials for enhanced wall and roof insulation can also influence the overall cost. For a free quote, please contact us.
Typically, the customization of a container camp project takes 10–15 days, depending on the specific requirements of the client. The customization process includes initial communication to understand the needs, layout design, confirmation of the 3D render, factory production, quality inspection, and shipping. Contact us to get your own production schedule!
East Asia (Japan, South Korea, Hong Kong, Taiwan): 1
day
Southeast Asia (Singapore, Malaysia, Thailand, etc.): 7
days
South Asia (India, Pakistan, etc.): 15 days
Australia and New Zealand: 20 days
Middle East (Dubai, Iran, and other Arab countries): 15
days
North Africa and the Mediterranean region (Turkey, Spain,
Greece, etc.): 25 days
European countries (UK, France, Germany, Italy, etc.): 28
days
East Africa (Sudan, Kenya, South Africa, etc.): Around 25
days
West Africa: 35 days
North America (East Coast and West Coast): East Coast 12
days, West Coast 22 days
Central America: 20 days
South America: 25 days to the West Coast, 30 days to the
East Coast
Free Consultation
Start Your Personalized Gift Journey
Provide personalized gift customization services, whether it is personal or corporate needs, we can tailor for you. Feel free to contact us for a free consultation!